Expansion of DCT Container Terminal
DCT T2B - Expansion of the DCT Container Terminal in the North Port of Gdansk

Location: Gdańsk, Polska
Contracting entity: DCT S.A.
Budget: PLN 53,000,000
Completion year: 2019
Execution period: 14 months

Characteristics
The works consist of the design and construction of a new pavement for the storage of shipping containers and another for maneuvering areas for the movement of terminal equipment. In addition, the reconstruction of the access to the Terminal and the reconstruction of Kontenerowa street is carried out

The works consist of the execution of:
- Concrete paving 57,000m2,
- cobblestone pavement- 4100 m2,
- 2 control zones with GOP system: 3300 m2 in total,
- drainage system,
- sanitation networks, rainwater, drinking and fire-fighting water, gas and electricity - low and medium voltage.