Renovation of Almazán main square

 Location: Almazán (Soria)
 Developer: Ministerio de Fomento    
 Budget: 2.453.869,68 €
 Completion year: 2011
 Execution period: 15 months

CHARACTERISTICS:
Constructed with corten steel and micro-laminated wood. Structure of 15 m long cantilever.
River viewpoint. Constructed with corten steel and micro-laminated wood. Structure of 15 m long cantilever.
Stairs to river. Constructed with corten steel and natural wood plates.
Pavements. 3000 m2 of ceramic pavement and 3.000 m2 of limestone pavement “Colmenar”.
Urban equipment: LED lighting, stone benches, etc.