Superstructure and Architectural in burying works of line 1 of MetroValencia at Benimamet Station
Location: Valencia
Developer: Gestor de la Red de Transporte y de Puertos de la Generalitat Valenciana
Budget: 24.803.069,47 €
Completion year: 2011
Execution period: 14 months
CHARACTERISTICS:
The work carried out are divided in three main blocks:
Track Assembly and electrification. Track on ballast on surface track and fixed directly over concrete slab on underground track. RENFE truck catenary adapted to FGV.
Rail: 6.120 m
Elastomeric blanket: 5.800 m2
Track catenary: 3.700 m
Construction of 2 station: Benimámet and Les Carolines-Fira. Lobby for access to platforms, Tickets sale room and technical rooms.
Structural Steel: 171.000 kg
Aluminium enclosure: 4.600 m
Glazed 10+10 with reflective tempered butyral sheet: 3.000
Station installation (ventilation and mechanical, plumbing and sewerage, fire protection, signage to the traveller) and railway installation (signage, control and railway communication)