Ouargla Tram
Location: Ouargla (Algeria)
Contracting entity: EMA - Entreprise Métro d’Alger
Budget: 205.327.694 €
Ending year: 2018
Execution time: 59 months
FEATURES:
The project under construction for the Ourgla tram (Algeria) is an 8.5 km line that connects the Hai – Nasr neighborhood with the center of the city of Ourgla:
· Double track on slab and throat rail
· Assembly of the catenary and traffic signaling
· Redevelopment of the streets where the tram is installed, along its entire length
· Redevelopment of the streets where the tram is installed, along its entire length
· A 40 m span metal arch bridge stands out as a singular structure