Levante High Speed. Section Torrejoncillo – Abadía de la Obispalía
Section: Torrejoncillo – Abadía de la Obispalía
Location: Cuenca (Spain)
Developer: Adif/ Generalitat Valenciana
Budget: 45.273.987,09 €
Completion year: 2010
Execution period: 20 months
CHARACTERISTICS:
The works consisted of the construction of 6,910 m of new platform, which included the execution of the following structures:
- 4 viaducts with spans between pires constant and equal to 30.5 m and a deck formed by lightweight post-tensioned concrete slab: Higueruelas of 1,056 m, Cigüela of 630 m, over the CUV-7032 of 112 m and Alto Molino of 92 m.
- 2 artificial tunnels: Higueruelas of 298 m and Alto Molino of 323.5 m
- 1 underpass and 1 overpass
In addition, the total volume of earthworks that was executed (levelling and embankment) amounted up to 3,552,266.74 m3