Levante High Speed. Section Torrejoncillo – Abadía de la Obispalía
Section: Torrejoncillo – Abadía de la Obispalía

 Location: Cuenca (Spain)
 Developer: Adif/ Generalitat Valenciana
 Budget: 45.273.987,09 €
 Completion year: 2010
 Execution period: 20 months

CHARACTERISTICS:

The works consisted of the construction of 6,910 m of new platform, which included the execution of the following structures:

  • 4 viaducts with spans between pires constant and equal to 30.5 m and a deck formed by lightweight post-tensioned concrete slab: Higueruelas of 1,056 m, Cigüela of 630 m, over the CUV-7032 of 112 m and Alto Molino of 92 m.
  • 2 artificial tunnels: Higueruelas of 298 m and Alto Molino of 323.5 m
  • 1 underpass and 1 overpass

In addition, the total volume of earthworks that was executed (levelling and embankment) amounted up to 3,552,266.74 m3