Ouargla Tram
Location
Ouargla, Argelia
Contracting entity
EMA (Entreprise Métro d’Alger)
Execution date
59 månader
Budget
205.327.694 €
FEATURES
The project under construction of the Ourgla tram (Algeria) is an 8.5 km line linking the Hai – Nasr neighborhood with the center of the city of Ourgla:
· Double track in plate and throat rail
· Catenary assembly and traffic signaling
· Redevelopment of the streets where the tram is implanted, along its entire length
· Construction of the Maintenance Center, which includes administration and control buildings, fixed installations, workshops, garages and substation
· It stands out as a singular structure a metallic arch bridge of 40 m of light