New railway access platform for the High Speed Railway of Levante. Section: La Alcoraya – Alicante

CHARACTERISTICS
The works consist of the execution of the UIC double-track railway platform for the access to Alicante for a speed of 250 km/h over a length of 9,999.883 m and, in addition, a provisional diversion of the Madrid-Alicante conventional line of 2,226.173 m. The following elementary works are included:
– Viaduct of 99 m over the road from Pla de Vallonga to cement plant
– Serreta Larga tunnel, of 333 m
– Viaduct over the A-7 and the Rambla de las  Ovejas, of 389.22 m
– Pergola bridge over the diverted railway track  Alicante-Villena, 86.42 m
– Freight track cross structure composed of a set of attached pergola bridges
– Tunnelling between slurry walls, in a length of 297.88 m
– 4 overpasses and 5 underpasses

Careers

Work
with us

Be part of a leading, international team in infrastructure development, committed to the professional growth of its people. Join Rover and work in a safe, diverse, and inclusive environment where teamwork, communication, and a spirit of continuous improvement drive new challenges and collective success.

LinkedIn

Rover Grupo | LinkedIn Rover Grupo | 44.308 seguidores en LinkedIn. 60 años construyendo sueños | Bienvenido a Rover Grupo!! Empresa valenciana de desarrollo de infraestructuras con presencia internacional. La empresa cubre todos los ámbitos de la obra civil: carreteras y autovías, ferrocarriles, marítimos, conservación de aguas, urbanizaciones, hospitales, fotovoltaica...

Follow us on LinkedIn