High-Speed Line of Levante. Játiva – Énova Section
Location
Valencia, Spain
Contracting entity
Administrador de Infraestructuras Ferroviarias (ADIF)
Execution date
38 months
Budget
62 millons €
CHARACTERISTICS
The works consist of the construction of a double‑track UIC‑gauge railway platform for the high‑speed rail connection between Madrid – Alicante – Valencia, in the Játiva–Énova section. The following main works are included:
- 800,000 m³ of embankments
- 6 viaducts
- High‑speed tunnel of 604 m
- Iberian‑gauge tunnel of 583 m
- Cut-and-cover tunnel of 281 m
- 5 overpasses and 1 underpass