Levante High Speed. Section Torrejoncillo – Abadía de la Obispalía

CHARACTERISTICS

The works consisted of the construction of 6,910 m of new platform, which included the execution of the following structures:
– 4 viaducts with spans between pires  constant and equal to 30.5 m and a deck formed by lightweight post-tensioned concrete slab: Higueruelas of 1,056 m, Cigüela of 630 m, over  the CUV-7032 of 112 m and Alto Molino of 92 m.
– 2 artificial tunnels: Higueruelas of 298 m and Alto Molino of 323.5 m
– 1 underpass  and 1 overpass
In addition, the total volume of earthworks that was executed (levelling and embankment) amounted up to 3,552,266.74 m3

Careers

Work
with us

Be part of a leading, international team in infrastructure development, committed to the professional growth of its people. Join Rover and work in a safe, diverse, and inclusive environment where teamwork, communication, and a spirit of continuous improvement drive new challenges and collective success.

LinkedIn

Rover Grupo | LinkedIn Rover Grupo | 44.308 seguidores en LinkedIn. 60 años construyendo sueños | Bienvenido a Rover Grupo!! Empresa valenciana de desarrollo de infraestructuras con presencia internacional. La empresa cubre todos los ámbitos de la obra civil: carreteras y autovías, ferrocarriles, marítimos, conservación de aguas, urbanizaciones, hospitales, fotovoltaica...

Follow us on LinkedIn