Expansion of the DCT Container Terminal in the North Port of Gdansk

Characteristics

The works consist of the design and construction of a new pavement for the storage of shipping containers and another for maneuvering areas for the movement of terminal equipment. In addition, the reconstruction of the access to the Terminal and the reconstruction of Kontenerowa street is carried out.
The works consist of the execution of:
– Concrete paving 57,000m2.
– cobblestone pavement- 4100 m2.
– 2 control zones with GOP system: 3300 m2 in total.
– drainage system.
– sanitation networks, rainwater, drinking and fire-fighting water, gas and electricity – low and medium voltage.

Careers

Work
with us

Be part of a leading, international team in infrastructure development, committed to the professional growth of its people. Join Rover and work in a safe, diverse, and inclusive environment where teamwork, communication, and a spirit of continuous improvement drive new challenges and collective success.

LinkedIn

Rover Grupo | LinkedIn Rover Grupo | 44.308 seguidores en LinkedIn. 60 años construyendo sueños | Bienvenido a Rover Grupo!! Empresa valenciana de desarrollo de infraestructuras con presencia internacional. La empresa cubre todos los ámbitos de la obra civil: carreteras y autovías, ferrocarriles, marítimos, conservación de aguas, urbanizaciones, hospitales, fotovoltaica...

Follow us on LinkedIn