slide5

La Plana Highway. Second carriageway. Section Betxí-Borriol

SUMMARY OF FUNCTIONAL CHARACTERISTICS
Length: 15,643 km
Specific speed: 100 km / h
Current section: Single carriageway 7/10 m
Proposed type section: Dual carriageway
– Median strip: Variable from 6 to 14 m
– carriageway width 7 – 11 m
– exterior shoulder with 2.50 m
–  interior shoulder with 1.50 m
Berm width 1.00 m
Firm Type 032
Minimum radius 500 m
Maximum slope 3.88%
Number of links 8
Bikeway:
– Length 18,499 m
– Width 3 m
Singular works:
– 4 bridges over the rivers: Seco de Betxí Mijares, Rambla de la Viuda and Borriol river
– 2 metal bicycle walkways
SUMMARY OF CONSTRUCTION CHARACTERISTICS
Execution period 30 months
Levelling  and excavations: 671,977 m3
Embankment: 472,997 m3
Structures: 15 (2 metallics)
Frames and porticos: 12
Graded Aggregate: 155,450 m3
Bituminous mixtures: 244,543 tn
Road surface thickness: 0.55 m
Irrigation ditches: 5,308 m
Pipes: 11,403 m
Service carriageways: 15,790 m
Equipment:
– 439 lighting units
– 1,279 trees
– 19,012 shrubs
– 32,700 m of enclosure fence
– 2,790 ml noise barrier
Occupied surface: 62.22 Ha

Careers

Work
with us

Be part of a leading, international team in infrastructure development, committed to the professional growth of its people. Join Rover and work in a safe, diverse, and inclusive environment where teamwork, communication, and a spirit of continuous improvement drive new challenges and collective success.

LinkedIn

Rover Grupo | LinkedIn Rover Grupo | 44.308 seguidores en LinkedIn. 60 años construyendo sueños | Bienvenido a Rover Grupo!! Empresa valenciana de desarrollo de infraestructuras con presencia internacional. La empresa cubre todos los ámbitos de la obra civil: carreteras y autovías, ferrocarriles, marítimos, conservación de aguas, urbanizaciones, hospitales, fotovoltaica...

Follow us on LinkedIn