Tramway corridor Alicante-Altea, Stretch 5
Location
Alicante, Spain
Contracting entity
Ferrocarrils de la Generalitat Valenciana (FGV)
Execution date
24 months
Budget
29 millons €
CHARACTERISTICS
The main works done were the following:
1. Duplication of the mentioned stretch 5 and tramway works.
2. The environment re-urbanization and removal of connection barrier that “el trenet” meant with the relocation of both platforms. The distribution is the carriageway next to buildings and the tramway next to promenade.
3. Construction of 5 span viaduct and 120 m long that allows transition between the stretch that runs parallel to the coast and the one that continues towards El Campello town.
4. Lighting works, signage, environmental mainstreaming and new urban furnishing of new urbanization.