Tramway corridor Alicante-Altea, Stretch 5

CHARACTERISTICS

The main works done were the following:
1. Duplication of the mentioned stretch 5 and tramway works.
2. The environment re-urbanization and removal of connection barrier that “el trenet” meant with the relocation of both platforms. The distribution is the carriageway next to buildings and the tramway next to promenade.
3. Construction of 5 span viaduct and 120 m long that allows transition between the stretch that runs parallel to the coast and the one that continues towards El Campello town.
4. Lighting works, signage, environmental mainstreaming and new urban furnishing of new urbanization.

Careers

Work
with us

Be part of a leading, international team in infrastructure development, committed to the professional growth of its people. Join Rover and work in a safe, diverse, and inclusive environment where teamwork, communication, and a spirit of continuous improvement drive new challenges and collective success.

LinkedIn

Rover Grupo | LinkedIn Rover Grupo | 44.308 seguidores en LinkedIn. 60 años construyendo sueños | Bienvenido a Rover Grupo!! Empresa valenciana de desarrollo de infraestructuras con presencia internacional. La empresa cubre todos los ámbitos de la obra civil: carreteras y autovías, ferrocarriles, marítimos, conservación de aguas, urbanizaciones, hospitales, fotovoltaica...

Follow us on LinkedIn