Design And Built New Quays 13-14 – Trelleborg Hamn

Characteristics

The project consists of the design and execution of two new docks for Ro – Ro traffic, docks 13 and 14, in the southeast of the port of Trelleborg. The works include the dredging of the basin, 776,000 m3 at an elevation of -9.00 m, the execution of 922 m of quay of 16-meter-long sheet piles braced with horizontal ties to rear sheet piles, the filling of the piers with the material from dredging, the construction of 922 m of cantilever beam, the assembly of two hydraulic ro-ro ramps for loading / unloading, the paving of the entire surface area of ​​100,000 m2, the drinking water, electricity, drainage, lighting and assembly of port equipment such as shield and V-shaped defenses, bollards of 75, 100 and 200 tons, draft winches, ladders, beacons, etc. to service the docks.

Careers

Work
with us

Be part of a leading, international team in infrastructure development, committed to the professional growth of its people. Join Rover and work in a safe, diverse, and inclusive environment where teamwork, communication, and a spirit of continuous improvement drive new challenges and collective success.

LinkedIn

Rover Grupo | LinkedIn Rover Grupo | 44.308 seguidores en LinkedIn. 60 años construyendo sueños | Bienvenido a Rover Grupo!! Empresa valenciana de desarrollo de infraestructuras con presencia internacional. La empresa cubre todos los ámbitos de la obra civil: carreteras y autovías, ferrocarriles, marítimos, conservación de aguas, urbanizaciones, hospitales, fotovoltaica...

Follow us on LinkedIn