Port Inner Basin new entrance (America’s Cup 2007)

CHARACTERISTICS

344 m long main breakwater and 889 m long counter dike. Berth of reinforced concrete floating caissons and granular filling necessary for 3 Ha of shelter level space.
Dredging: 1.349.654 m3
Level space granular filling: 239.744 m3
Rubble mound bedding layer and breakwaters, ripap: 2.824.600 t
Mass Concrete in blocks and special pieces: 40.746 m3
Submerged concrete: 23.658 m3
Reinforced Concrete floating caissons:  13 uds.
Quay superstructure:
– Mass Concrete HM-30 on heel: 33.529 m3
– Reinforced concrete HA-30 at edge quay beam: 7.571 m3
– Steel frame:  238.030 kg
– Concrete pavement 4 Mpa: 3.339 m3

Careers

Work
with us

Be part of a leading, international team in infrastructure development, committed to the professional growth of its people. Join Rover and work in a safe, diverse, and inclusive environment where teamwork, communication, and a spirit of continuous improvement drive new challenges and collective success.

LinkedIn

Rover Grupo | LinkedIn Rover Grupo | 44.308 seguidores en LinkedIn. 60 años construyendo sueños | Bienvenido a Rover Grupo!! Empresa valenciana de desarrollo de infraestructuras con presencia internacional. La empresa cubre todos los ámbitos de la obra civil: carreteras y autovías, ferrocarriles, marítimos, conservación de aguas, urbanizaciones, hospitales, fotovoltaica...

Follow us on LinkedIn