Sheltering works for Valencia Port enlargement

FEATURES

Phase I execution for Valencia port enlargement, consisting of a 3.385 m long and 12-21.5 m depth new main breakwater and a 1.096 m long and 11-18.5 m depth counter dike.
Dredging: 648.606,460 m3
Level space granular filling: 1.993.338,712 m3
Rubble mound bedding layer and breakwaters, riprap: 8.337.993,47 t
Mass concrete hM-30 for 9-45 t blocks:: 302.344,470 m3
Reinforced concrete floating caissons:  48 uts<
Quay superstructure: 
– Mass concrete hM-30 on heel:  3.610,073 m3
– Reinforced concrete ha-30 at edge quay beam:  47.007,215 m3
Concrete pavement 4 Mpa:  10.017 m3

Careers

Work
with us

Be part of a leading, international team in infrastructure development, committed to the professional growth of its people. Join Rover and work in a safe, diverse, and inclusive environment where teamwork, communication, and a spirit of continuous improvement drive new challenges and collective success.

LinkedIn

Rover Grupo | LinkedIn Rover Grupo | 44.308 seguidores en LinkedIn. 60 años construyendo sueños | Bienvenido a Rover Grupo!! Empresa valenciana de desarrollo de infraestructuras con presencia internacional. La empresa cubre todos los ámbitos de la obra civil: carreteras y autovías, ferrocarriles, marítimos, conservación de aguas, urbanizaciones, hospitales, fotovoltaica...

Follow us on LinkedIn