Platform of the High Speed North-Northwest Corridor. Madrid – Galicia Line. Section: La Canda Tunnel. Right Track

CHARACTERISTICS

The works carried out consist of the excavation of the right platform of a twin-tube tunnel with a total length of 7,412 m and the execution of the joint exit portal of the two tunnels on its west side by means of a double artificial tunnel. The following elementary works are included:

-1 tunnel with a single track (right track) of 7,201,5 m executed by the classical method
-16 connection utility tunnels between tunnels
-2 artificial tunnels, corresponding to the exit on the west side of La Canda tunnels (left and right track), of 79.5 m each
-302 m of open-air platform (171 m left track, 131 m right track)

Careers

Work
with us

Be part of a leading, international team in infrastructure development, committed to the professional growth of its people. Join Rover and work in a safe, diverse, and inclusive environment where teamwork, communication, and a spirit of continuous improvement drive new challenges and collective success.

LinkedIn

Rover Grupo | LinkedIn Rover Grupo | 44.308 seguidores en LinkedIn. 60 años construyendo sueños | Bienvenido a Rover Grupo!! Empresa valenciana de desarrollo de infraestructuras con presencia internacional. La empresa cubre todos los ámbitos de la obra civil: carreteras y autovías, ferrocarriles, marítimos, conservación de aguas, urbanizaciones, hospitales, fotovoltaica...

Follow us on LinkedIn