North district road interconnection and Alcoy Viaduct

CHARACTERISTICS

Construction of a road of 683 m long which 426 m are made by a mixture viaduct of eight spans (maximum span: 64 m), circle top view and maximum slope of 8% and vertical curve over the Serpis river. The viaduct is composed by:
  • 7 reinforced concrete double shaft pier above 9,30 and 22 m height, braced on top.
  • Steel girder structure with box section and variable depth (between 3 and 6 m)
  • Continuous reinforced concrete deck casted on site, 13,50 m wide, with joints only on the abutments
The cross section is composed by 2 carriageways of 3,80 m and 2 footpaths on the edges (one for pedestrians and other for bicycles) protected with parapet and hand railing.

Careers

Work
with us

Be part of a leading, international team in infrastructure development, committed to the professional growth of its people. Join Rover and work in a safe, diverse, and inclusive environment where teamwork, communication, and a spirit of continuous improvement drive new challenges and collective success.

LinkedIn

Rover Grupo | LinkedIn Rover Grupo | 44.308 seguidores en LinkedIn. 60 años construyendo sueños | Bienvenido a Rover Grupo!! Empresa valenciana de desarrollo de infraestructuras con presencia internacional. La empresa cubre todos los ámbitos de la obra civil: carreteras y autovías, ferrocarriles, marítimos, conservación de aguas, urbanizaciones, hospitales, fotovoltaica...

Follow us on LinkedIn