slide1

Manisses Hospital

CHARACTERISTICS

The works consisted in the execution of two volumes of 150 m long by 16 m wide each, both joined by the centre and by the ends, giving rise to the formation of two large trapezoidal inner courtyards and a face of each volume, which tower over the alignment of the lateral facades. The building has six storeys above ground level that lead to a constructed area of 31,230.55 m2 and a parking basement with a constructed area of 17,467.00 m2.
The main work units are:
– 120,000 m3 of open pit excavation
– 12,600 ml of piles in situ CCPI-8
– 15,100 m3 of HA25 in slabs on grade
– 6,000 m2 of cavity-wall facade

Careers

Work
with us

Be part of a leading, international team in infrastructure development, committed to the professional growth of its people. Join Rover and work in a safe, diverse, and inclusive environment where teamwork, communication, and a spirit of continuous improvement drive new challenges and collective success.

LinkedIn

Rover Grupo | LinkedIn Rover Grupo | 44.308 seguidores en LinkedIn. 60 años construyendo sueños | Bienvenido a Rover Grupo!! Empresa valenciana de desarrollo de infraestructuras con presencia internacional. La empresa cubre todos los ámbitos de la obra civil: carreteras y autovías, ferrocarriles, marítimos, conservación de aguas, urbanizaciones, hospitales, fotovoltaica...

Follow us on LinkedIn